Home
Global Journal of Engineering and Technology Advances
International Peer reviewed Engineering Journal || Crossref DOI || Impact Factor 8.6 || ISSN: 2582-5003

Main navigation

  • Home
    • Journal Information
    • Editorial Board Members
    • Reviewer Panel
    • Abstracting and Indexing
    • Journal Policies
    • Our CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Join Editorial Board
    • Join Reviewer Panel
  • Contact us
  • Downloads

Research & review articles are invited for publication in September 2026 (Vol. 28, Issue 3) || Submission: up to 28th September || Editorial decision: within 48 hrs.

Managing large-scale capital projects in oil and gas: Cross-functional engineering leadership, cost performance and execution excellence

Breadcrumb

  • Home
  • Managing large-scale capital projects in oil and gas: Cross-functional engineering leadership, cost performance and execution excellence

Victor Nnanyelu Onyechi *

Schlumberger (Slb), Nigeria.
 
Research Article
Global Journal of Engineering and Technology Advances, 2024, 21(03), 210-223.
Article DOI: 10.30574/gjeta.2024.21.3.0233
DOI url: https://doi.org/10.30574/gjeta.2024.21.3.0233
Received on 04 November 2024; revised on 22 December 2024; accepted on 28 December 2024
 
Managing large-scale capital projects in the oil and gas sector requires rigorous coordination of technical, financial, and organizational resources to ensure predictable delivery, cost control, and operational reliability. These projects, often characterized by multi-billion-dollar budgets, geographically distributed teams, volatile market conditions, and demanding regulatory frameworks, are inherently complex and exposed to significant execution risks. Traditional project management approaches, while providing foundational planning, scheduling, and contracting structures, frequently fall short when cross-functional engineering alignment and real-time performance visibility are lacking. Contemporary project execution models emphasize integrated project delivery, where multidisciplinary engineering teams collaborate from concept development through commissioning using shared data environments, digital asset models, and standardized decision-gate controls. This cross-functional leadership approach strengthens design consistency, improves procurement agility, and mitigates scope growth and rework. In parallel, cost performance strategies now leverage advanced cost modeling, probabilistic estimating, and continuous cost-risk reconciliation to manage uncertainties proactively rather than reactively. Digital project control systems, including earned value analytics, construction productivity tracking, and scenario-based forecasting, offer greater transparency for stakeholders and support timely intervention on deviations. Execution excellence is further driven by structured contractor oversight, competency-based workforce planning, and lessons-learned integration across project portfolios. The integration of these practices enables improved project predictability, reduced time-to-first-production, and more resilient capital allocation. Ultimately, managing large-scale capital projects effectively requires leadership cultures that empower collaboration, foster disciplined decision-making, and leverage digital and analytical tools to maintain alignment between scope, schedule, cost, and operational objectives across all phases of project development.
 
Capital Project Execution; Cross-Functional Engineering Leadership; Cost Performance; Project Controls; Oil And Gas Development; Execution Excellence
 
https://gjeta.com/sites/default/files/fulltext_pdf/GJETA-2024-0233.pdf

Preview Article PDF

Victor Nnanyelu Onyechi. Managing large-scale capital projects in oil and gas: Cross-functional engineering leadership, cost performance and execution excellence. Global Journal of Engineering and Technology Advances, 2024, 21(3), 210-223. Article DOI: https://doi.org/10.30574/gjeta.2024.21.3.0233

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content

          

 

Copyright © 2026 Global Journal of Engineering and Technology Advances - All rights reserved

Developed & Designed by VS Infosolution