Home
Global Journal of Engineering and Technology Advances
International Peer reviewed Engineering Journal || Crossref DOI || Impact Factor 8.6 || ISSN: 2582-5003

Main navigation

  • Home
    • Journal Information
    • Editorial Board Members
    • Reviewer Panel
    • Abstracting and Indexing
    • Journal Policies
    • Our CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Join Editorial Board
    • Join Reviewer Panel
  • Contact us
  • Downloads

Research & review articles are invited for publication in September 2026 (Vol. 28, Issue 3) || Submission: up to 28th September || Editorial decision: within 48 hrs.

Field implementation and technical evaluation of hot tapping on active gas pipelines

Breadcrumb

  • Home
  • Field implementation and technical evaluation of hot tapping on active gas pipelines

Hendry Sakke Tira * and Muhammad Zidane Athaya Zulkipli

Department of Mechanical Engineering, Faculty of Engineering, University of Mataram, Indonesia.
 
Research Article
Global Journal of Engineering and Technology Advances, 2025, 25(03), 091-097.
Article DOI: 10.30574/gjeta.2025.25.3.0342
DOI url: https://doi.org/10.30574/gjeta.2025.25.3.0342
Received 28 October 2025; revised on 06 December 2025; accepted on 08 December 2025
 
Hot tapping has become an essential technique for pipeline modification in situations where shutdown is impractical or economically undesirable. This study presents a comprehensive field evaluation of a hot tapping operation performed on an active API 5L Grade B natural gas pipeline within a regional distribution network. The objective was to document the technical execution, assess weld quality through non-destructive testing (NDT), evaluate pneumatic leak testing, and analyze the performance of the drilling process, including coupon retrieval. A split tee and trunnion-mounted ball valve assembly were installed following controlled welding procedures, and weld integrity was verified using PT, MPI, and UT examinations, all of which indicated defect-free joints. Pneumatic testing using staged nitrogen pressurization confirmed full sealing performance without pressure loss or leakage indications. The hot tapping machine operated smoothly, producing a cleanly cut coupon successfully retrieved by the safety wire. The operation also incorporated risk mitigation controls such as gas monitoring, tool verification, and procedural discipline, resulting in zero incidents. The findings align with established literature regarding the effectiveness and safety of modern hot tapping methods. Overall, this case study provides practical insights into field implementation, supporting the broader adoption of hot tapping for maintaining service continuity in active gas pipeline networks.
 
 
Hot Tapping; Active Gas Pipeline; Weld Integrity; Non-Destructive Testing (NDT); Pneumatic Leak Test
 
https://gjeta.com/sites/default/files/fulltext_pdf/GJETA-2025-0342.pdf

Preview Article PDF

Hendry Sakke Tira and Muhammad Zidane Athaya Zulkipli. Field implementation and technical evaluation of hot tapping on active gas pipelines. Global Journal of Engineering and Technology Advances, 2025, 25(3), 091-097. Article DOI: https://doi.org/10.30574/gjeta.2025.25.3.0342

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content

          

 

Copyright © 2026 Global Journal of Engineering and Technology Advances - All rights reserved

Developed & Designed by VS Infosolution