Global Journal of Engineering and Technology Advances, 2026, 29(02), 143–154
Article DOI: 10.30574/gjeta.2026.29.2.0329
Received on 11 October 2026; revised on 21 November 2026; accepted on 23 November 2026
Lifting padeyes carry the installation load of a subsea manifold, so their strength must be demonstrated before the lift, yet studies of manifold installation rarely extend to the structural check of the lifting points. This study assesses a cheek-plate reinforced S355 padeye (main plate 15 mm, cheek plates 5 mm, 20 mm pin hole) for the installation of a subsea manifold in conditions representative of the Egina field, offshore Nigeria. The design is based on the maximum tether tension from a separate installation analysis (36,907 N) factored for weight contingency (1.10), consequence (1.35) and dynamic amplification (1.30). In the analytical check, the tensile, bearing and shear stresses were 8.31, 64.76 and 60.88 N/mm², equal to 3.9%, 15.2% and 42.9% of the allowable values from AISC-ASD and API RP 2A-WSD, with shear governing. A finite element analysis in Abaqus, with the base fixed and the load applied through a coupled reference point at the pin hole, gave a maximum von Mises stress of 103.3 N/mm² at the edge of the pin hole, about 29% of the 355 N/mm² yield strength, a stress of 36.10 N/mm² at the section between the hole and the base, and a maximum displacement of 0.056 mm. The padeye is adequate for the load applied in the model. The padeye geometry and load factors are assumed design values, and the load basis requires documentation before the result is used for design.
Padeye, Lifting point, Subsea manifold, Finite element analysis, Abaqus, Von Mises stress, Gulf of Guinea
Preview Article PDF
Morrison Inengiyemiema, Sunday Koko Andrew and Nitonye Samson. STRUCTURAL DESIGN AND FINITE ELEMENT ASSESSMENT OF A SUBSEA MANIFOLD LIFTING PADEYE FOR INSTALLATION LOADS: EGINA FIELD CASE STUDY, GULF OF GUINEA. Global Journal of Engineering and Technology Advances, 2026, 29(02), 143–154. Article DOI: https://doi.org/10.30574/gjeta.2026.29.2.0329.